Project Overview
The City of Burien is responsible for repairs and maintenance of approximately 137 centerline miles of paved roads (residential 78%, collector 13%, arterial 9%).
The annual pavement management program consists of pavement preservation applications (crack sealing, micro surfacing and slurry seal coatings), maintenance items (pothole repairs), together with necessary full reconstruction and rehabilitation pavement overlay projects. The purpose of the program is to reduce the overall long-term cost for maintaining the condition of Burien streets.
Each year projects are selected by reviewing the current pavement condition Index (PCI), field inspections, and resident input.
2024 Pavement Repairs and Overlay Projects
The City will be conducing necessary pavement repairs, pavement preservation, and improvements. The project will consist of pothole repairs, grind and overlay of new asphalt pavement, and ADA-compliant crosswalk improvements along school pedestrian corridors.
2024 Project Areas:
- Site 1, Gregory Heights Neighborhood: 16th Ave SW (SW 168th St. to SW 160th St.)
- Site 2, Downtown Neighborhood: SW 154th St (from 4th Ave SW to 2nd Ave SW)
- Site 3, Beverly Park Neighborhood: S. 115th St (from 10th Ave S. to 12th Ave S.)
Project Status
Construction Schedule: September thru October 2024.
The City of Burien has contracted with Tucci and Sons, Inc, General Contractor for street repairs and repaving work as part of our annual Pavement Management Program. Road Work is scheduled to commence Tuesday, September 3rd, 2024.
Contractor will install “No Parking Signs” and will notify residents of any temporary restrictions accessing driveways or property throughout construction and street paving work.
Thank you for your patience and cooperation during the project.
Reminders / Advisories:
• Temporary parking closures may take place along streets during construction.
• Temporary lane closures and detours may take place during construction.
• Temporary construction activity in front of property may take place from 7:00 am to 5:00 pm.
Project Updates
The city will provide updates and notify those residents by mail who may be affected by construction and paving activities.
Project Manager
David Traub, Capital Projects Manager
(206) 241-4647
[email protected]