2024 Pavement Management Program

Project Overview

The City of Burien is responsible for repairs and maintenance of approximately 137 centerline miles of paved roads (residential 78%, collector 13%, arterial 9%).

The annual pavement management program consists of pavement preservation applications (crack sealing, micro surfacing and slurry seal coatings), maintenance items (pothole repairs), together with necessary full reconstruction and rehabilitation pavement overlay projects. The purpose of the program is to reduce the overall long-term cost for maintaining the condition of Burien streets.

Each year projects are selected by reviewing the current pavement condition Index (PCI), field inspections, and resident input.

2024 Pavement Repairs and Overlay Projects

The City conducted necessary pavement repairs, pavement preservation, and improvements. The project consisted of pothole repairs, grind and overlay of new asphalt pavement, and ADA-compliant crosswalk improvements along school pedestrian corridors.

2024 Project Areas

  • Site 1, Gregory Heights Neighborhood: 16th Avenue SW (SW 168th Street to SW 160th Street)
  • Site 2, Downtown Neighborhood: SW 154th Street (from 4th Avenue SW to 2nd Avenue SW)
  • Site 3, Beverly Park Neighborhood: South 115th Street (from 10th Avenue South to 12th Avenue South)

Project Status 

This project was completed in 2024.

 

Updated December 1, 2024